Identify the stated objective

A cosmetic finish repair, material restoration and structural repair are different objectives. The proposal should say which one it addresses.

Look for the design responsibility

Where there is a structural question, ask who reviews it and supplies details. A contractor’s surface estimate should not be mistaken for an engineering determination.

Include access and protection

Wall-base work may affect soil, paving and nearby services. Compare these items along with the visible repaired area.

Define the record at completion

Agree on work-stage photos and any required professional review. A finished coating is only one part of the repair record.

Photos help start the review. Access, concealed conditions and required professional review can change the construction scope.

← All repair guides